Gammel Engineering is proud that we were able to plan and support the project in service phases 2 to 8. The entire building is supplied with heating and cooling via two reversible heat pumps. At the same time, the office and development rooms are supplied with fresh air via 4 ventilation systems.
We would like to thank our planning partners and the client for their excellent and constructive collaboration and are delighted to share this special award with them!