Energy efficiency through newly installed CHP system
"The production of high-precision parts places maximum demands on companies.
When constructing the new production buildings in Roding, Upper Palatinate, Stangl & Co. GmbH Präzisionstechnik took an unusual approach: with the installation of a central energy supply, a holistic cooling and air conditioning concept was also introduced for the new production and administration building
Read the full report here: Sanitär + Heizungstechnik 11/2017
---
Source: Trade journal "Sanitär + Heizungs Technik" / Krammer Verlag
www.sht-online.de