Obituary: Martin Zieglmeier
With deep sorrow and great respect, we bid farewell to an extraordinary and kind-hearted person who, with his loyal and confident demeanor, was always a role model for the entire company.
On 16.04.2014, the ORC module is delivered and positioned at its installation site. The ORC system is the second power generation stage after the modified gas turbine. This gives Naturenergie Hersbruck the world's first GuORC system for the combined generation of electricity and heat from natural biomass. The integration into the existing plant is being prepared and will be completed in the week after Easter.
With deep sorrow and great respect, we bid farewell to an extraordinary and kind-hearted person who, with his loyal and confident demeanor, was always a role model for the entire company.
Today we celebrated a special anniversary: Florian Prantl has been with Gammel Engineering for 20 years. Over these two decades, technologies have changed, projects have evolved, and teams have been reorganized. One thing has remained constant: Florian Prantl is a reliable member of the Gammel Engineering team.
In 2026, Gammel Engineering was once again ready to head to the Gillamoos! Together with our partners, we kicked off the “fifth season” in Abensberg on Friday, as is our tradition.