On 16.04.2014, the ORC module is delivered and positioned at its installation site. The ORC system is the second power generation stage after the modified gas turbine. This gives Naturenergie Hersbruck the world's first GuORC system for the combined generation of electricity and heat from natural biomass. The integration into the existing plant is being prepared and will be completed in the week after Easter.