One year of heat from Reichenhall for Bad Reichenhall
This concept was awarded the first tender for iKWK systems by the Federal Network Agency in Berchtesgadener Land in 2018 - as one of only five projects.
As a result, Stadtwerke Bad Reichenhall awarded the contract for the general technical planning to Gammel Engineering to build the new energy center and the district heating network.
During the concrete planning phase, a power plant was created consisting of
two natural gas CHP units, each with 3.4 megawatts of electrical (MWel) and 3.2 MW of thermal (MWth) output,
two ammonia groundwater heat pumps with 1.5 MWth and
two power-to-heat plants of 1.2 MWth each. This also includes
three heat storage units of 250 m³ each and one
peak load boiler with a heat output of 5 MW.
The heating network was developed in the first expansion stage with a route length of around 6 km, slightly less than expected in the feasibility study
The entire power plant was integrated into the existing Stadtwerke underground bus garage - which of course requires meticulous as-built surveys and 3D planning.
Michael and Gudrun Gammel's brother-in-law, Martin Kundler from Neustadt an der Donau, has been a passionate hobby gardener for many years. His large garden with numerous trees and lots of vegetables is a real treasure trove of nature.
After a long period of planning, lots of ideas and countless hours, the time has finally come: our new homepage is live! We are looking forward to your feedback!
FUTURE-proof concepts against the energy shock in milk and cheese production
Rising energy and raw material prices can be counteracted by using sustainable energy technologies and thus reducing CO2 emissions. This not only significantly reduces cost explosions, but also reduces your own ecological footprint. Pioneers in the dairy industry are also focusing on this.