Rib Dinner at the Roding City Hall
On October 29, 2026, Gammel Engineering attended a Ripperl dinner at the RODwuid restaurant in the Roding City Hall.
The first construction phase is currently in operation and others are in progress. The new hall ventilation system ensures the controlled exchange of exhaust air and fresh air and also heats the hall. Decentralized filter separators are provided for the process ventilation and extraction of the machines and machining centers.
To protect employees and the environment, smoke, dust and oil mist are filtered out of the exhaust air by the systems and filter systems.
The refurbishment and separation into central hall basic ventilation and decentralized process ventilation also ensures increased flexibility when adapting the machining processes and optimizing energy costs.
As can be seen in the pictures, heavy equipment was used to convert and set up the systems and deliver the components.
Gammel Engineering, together with MAN, is delighted with the successful conversions in the first construction phase and looks forward to further successful cooperation for the next upcoming measures.
On October 29, 2026, Gammel Engineering attended a Ripperl dinner at the RODwuid restaurant in the Roding City Hall.
The Catholic Youth Welfare Service (KJF) is building a shared living community in Rohr i. NB with four residential units for a total of 24 adults with disabilities. And not on the outskirts, but right in the heart of town. This is exactly what inclusion in action looks like.
CONNECTA is Bavaria’s largest student-organized career fair and a place where the business community and the next generation of professionals can truly engage in dialogue. We were there again in 2026: On October 21 and 22, we showcased our company on the OTH Regensburg campus at the fair’s 30th edition.