Press

Sustainable heat supply in Kelheim: expansion of the local heating network is progressing

11.06.2025

Sustainable heat supply in Kelheim: expansion of the local heating network is progressing

In Kelheim, the district heating network is being continuously expanded to supply the city with sustainably generated heat. in 2009, a concept for networking the heat islands was developed based on the experience of combined heat and power plants and biomass cogeneration plants. the first heat island was introduced in 1994. The construction of a CHP plant in 2011 was an important step towards efficiently connecting local heat sources. The expansion of the network is being driven forward step by step, with the expansion into the city centre and the district high school in 2021. Economic factors and long-term investments play a central role in the successful implementation of the project.

You can read the entire article at energy-fachzeitung.com!

(Image source: @einfachgut.kreativ.werkstatt)

More News

Gammel-Inside

🍏 From the harvest straight into the jar 🍏

Read more
25.08.2025
Gammel-Inside

Our new homepage is online!

Read more
18.08.2025
Press

FUTURE-proof concepts against the energy shock in milk and cheese production

Read more
06.08.2025
Experience and innovation
in every project. *
Contact
Gammel Engineering GmbH
An den Sandwellen 114
93326 Abensberg
Office Cham
Gewerbepark Chammünster Nord 3
93413 Cham

Careers at Gammel Engineering